Services

Bathroom Remodeling

Well-built bathrooms start behind the tile.

Turnkey construction
Renovated Vardall Court bathroom with a shower, soaking tub, and double vanity

Built around coordination and accountability.

Our bathroom projects combine waterproofing, plumbing, electrical, ventilation, tile, glass, cabinetry, fixtures, and finish carpentry into one coordinated scope.

  • Waterproofing, tile, and shower systems
  • Plumbing, ventilation, lighting, and electrical
  • Vanities, glass, fixtures, trim, and finish work

The details behind a finished bathroom

A bathroom renovation depends on the work that cannot be seen once the tile is installed. Shower waterproofing, floor preparation, plumbing connections, ventilation, electrical protection, and framing all affect long-term performance. We plan those assemblies along with the layout, fixtures, tile, cabinetry, and glass.

Changing a tub to a shower, moving a toilet or vanity, or designing a curbless entry may require adjustments to the framing and drain locations. The possibilities depend on the home's existing structure and plumbing. Reviewing those conditions early helps connect the design homeowners want with the construction needed to achieve it.

One coordinated bathroom construction scope

Hardy Homes coordinates demolition, plumbing and electrical changes, shower preparation and waterproofing, tile installation, cabinetry, lighting, glass, trim, and final fixtures. The sequence matters: waterproofing and appropriate inspections or testing need to be addressed before finishes conceal the underlying work.

Material decisions are closely linked to construction. Large-format tile, niches, benches, specialty shower fixtures, heated floors, and frameless glass can affect backing, rough-in locations, and layout dimensions. We discuss those choices before the finishes are ordered so they are integrated rather than added as last-minute changes.

Common questions

Does Hardy Homes offer design services?
Yes. Hardy Homes offers in-house design services to help bring your vision to life while working within your project's scope and budget.
Can we convert a tub into a walk-in or curbless shower?
Often, but the available floor depth, framing, drain position, and required slope determine what is practical. A curbless design needs early planning rather than simply omitting the curb.
How long does a bathroom renovation take?
Depending on the scope, existing conditions, and material availability, a primary bathroom renovation can often take approximately one to two months. To help keep construction on schedule, Hardy Homes encourages clients to finalize selections and confirm lead times before work begins.

Explore related projects

Discuss Your Project